Resco Systems

Log Details

_id 670870082012986bc0c84db0
Confirmed True
Date 2024-10-10
Operators Boomer
Hours {'boomer': '10', 'jack': '10', 'ralph': '10'}
Profiles [{'code': '24s', 'length': '12', 'quantity': '0', 'color': 'gray', 'totalWeight': 0}]
Blowers no
Amb_temp 55
Zone_temp {'1': {'am': '0', 'noon': '0', 'pm': '0'}, '2': {'am': '0', 'noon': '0', 'pm': '0'}, '3': {'am': '0', 'noon': '0', 'pm': '0'}, '4': {'am': '0', 'noon': '0', 'pm': '0'}, '5': {'am': '0', 'noon': '0', 'pm': '0'}, '6': {'am': '0', 'noon': '0', 'pm': '0'}, '7': {'am': '0', 'noon': '0', 'pm': '0'}, '8': {'am': '0', 'noon': '0', 'pm': '0'}}
Remarks Ran all wire and conduit to Sky Box 2 for wash pot and Ralph started putting bus bars and breakers in main box. relocated hot air blower and con-air plastic dryer to box staging area. boomer made a runs to Plat for a fuse the to ISSCO for a Hydralic hose, latter to fars for nuts bolts and paint. Gas and wire showed up during lunch. shipped filedturf USA around 12:30pm. jack worked on wash pot project and moved the heater and plastic dryer with Ralph jack was also able to get vacuum loader mounted on top of con air dryer . Ralph started the day finishing cutting the 2x10's and clearing the rolling table. we pushed out the 210s we ran at end of day yesterday. signs of moisture. there was 0% fractional. 0.12% blow was used 100% bucket and 2.50 color
Blendbox_address 65a6c348238ce513e64e4269
Additive_batches 0
Plastics {'inj': {'source': 'Rose Proj. Canada', 'color': 'white', 'percent': '100'}, 'ext': {'source': 'Argraplas', 'color': 'natural', 'percent': '0'}}
Totalweight 0
Timestamp 1728543600.0
Edit